Australia: 0411 173 774

Today was all about finishing as much work on Trompe Secret Waterfall as possible before a well-deserved two-week break. I started by sealing the broken render at the end of the gutter that we recently repaired, then dove into perfecting the rock surfaces. On the front panel, I added a grunge texture around the top edge of the shadow, kept it paler under the arch, and added a sparkle texture to the ceiling. I meticulously worked on detailed rock textures above the roof on both sides, adding nuanced color and depth.

Moving to the side panels, I continued building up rock colors and shadows. On the left side, I softened the top edges, added some sharp contrasts, and developed a grunge rock texture. The right side panel got similar treatment — rounding rock edges, introducing sharp details, and creating that weathered look we’ve been aiming for. As the day drew to a close, I packed up all the equipment above the scaffold, carefully storing everything for our two-week break.

Check out the full progress in a timelapse here:

Here’s what the mural looked like at the end of the day!

It feels good to step back and know we’ve brought Trompe Secret Waterfall another step closer to completion. Can’t wait to see how it all looks when we return!

Become a Trompe Mural Fan!

Stay up to date with Jacqueline Hill's amazing trompe l'oeil projects, from start to end.

Interest

Success! Very soon you will have the latest and greatest trompe l'oeil mural updates at your fingertips.